Rotorua Health Camp
This project consisted of a major refurbishment and extension to the existing health camp facility as well as the construction of a new gymnasium.
Works to the building exterior included a complete re-configuration of the front entry roof and roof areas over the new house block and louge areas. New roof linings were fitted to these areas and the existing roof linings that were retained, were repainted. The fascia, eyebrow detail and cladding was revised and the front entry car park was also re-configured. External repairs were also undertaken as well as a complete external repaint.
Internally, new finishes were provided throughout, the accommodation layout was re-configured and new sleeping, bathroom, living and dining areas were constructed. The administration, general dining and the art and craft areas were also upgraded.